Processing the request – H3C Technologies H3C Intelligent Management Center User Manual

Page 92

Advertising
background image

84

8.

On Abstract page, view settings. If changes need to be made, click Previous to return to previous

pages. Click Finish.

9.

Click Audit to bring up the request submit page as shown inFigure 62.
The page displays the iCC deployment task list. A link to the process is provided. You can click the

link to view the process status.

Figure 62 Submitting a request for changing an iCC configuration

10.

Under Deployment Task List, select the tasks you want to execute, click Run, and then confirm that
you want to run the process.
Under Status >Operation Result, click the task link to view the View Execution Result page, which
provides details and status of the process.

Processing the request

After the request is submitted and created, it passes through different processors until it is closed or

rejected. In the audit process, the processor can approve or reject the request.

Figure 63 Approving a request

1.

You can view the state of the iCC configuration change request in IMC, by clicking the icon in the
Configuration process column, as shown in

Figure 64

.

2.

After clicking the icon, you will be shown the audit results in SOM.

Advertising