88
If the request is rejected, you can click the icon to modify the task and resubmit a request for changing
ACL configuration. If you enable SOM auditing for a task that was formerly disabled with SOM auditing,
the following error message appears when you try to modify the task: The process instance has been
deleted.
Configuring a VLAN change process
A VLAN change process allows operators that have no rights to manage devices to submit VLAN
configuration change requests. The requests are audited before IMC applies the configuration to the
network. A VLAN change process involves submitting, auditing, and confirming requests.
Submitting a request for changing a VLAN configuration
1.
Use a self-service account to log in to the IMC system.
2.
Click the Service tab on the top navigation bar.
3.
From the left navigation pane, select VLAN Management >Batch Deploy.
4.
Click a submenu:
•
Access Ports
•
Trunk Ports
•
Hybrid Ports
•
VLAN
5.
Enter the VLAN configuration task settings as needed, and click Submit.
6.
Click Audit to bring up the request submit page as shown in
Figure 70
.
7.
Type the information and click OK.
The page displays the VLAN deployment task list. A link to the process is provided. You can click
the link to view the process status.