Test run 17.4 – HEIDENHAIN TNC 640 (34059x-02) ISO programming User Manual

Page 521

Advertising
background image

Test Run

17.4

17

TNC 640 | User's Manual for DIN/ISO Programming | 5/2013

521

Execute test run

If the central tool file is active, a tool table must be active (status S)

to conduct a test run. Select a tool table via the file manager (PGM

MGT) in the Test Run mode of operation
With the BLANK IN WORK SPACE function, you activate working

space monitoring for the test run, See "Showing the workpiece

blank in the working space ", page 517.

Select the Test Run operating mode

Call the file manager with the PGM MGT key and

select the file you wish to test, or

Go to the program beginning: Select line 0 with

the GOTO key and confirm your entry with the

ENT key

The TNC then displays the following soft keys:

Functions

Soft key

Reset the blank form and test the entire program

Test the entire program

Test each program block individually

Halt test run (soft key only appears once you

have started the test run)

You can interrupt the test run and continue it again at any point

—even within a fixed cycle. In order to continue the test, the

following actions must not be performed:

Selecting another block with the arrow keys or the GOTO key
Making changes to the program
Switching the operating mode
Selecting a new program

Advertising