Ex 5/7/11rt systems – MGE UPS Systems EX-7 User Manual

Page 38

Advertising
background image

2.6

Remote Emergency Power Off (REPO) Communication Port

The end user is responsible for the installation of a Remote Emergency Power Off function. Installation must be
carried out in compliance with local code regulations.

To shutdown the entire system completely in case of emergency:

◗ Disconnect the AC input to the Power Module by opening up the upstream circuit breaker connecting the

utility power to the Power Module.

◗ Turn off the circuit breaker of the Battery Module connecting to the Power Module.

◗ Turn off the circuit breaker of the subsequent Battery Modules, if applicable.

All these steps above should be performed via a single device.

To simplify the last two steps, the Power Module provides an RJ-11, six contact connector on the back panel, called
Remote Emergency Power Off (REPO) port. Upon applying a voltage source (5-27VDC, 10mA max.) to pins 2, 4 of
this port, the Power Module will send a signal to trip off the shunt trip on each circuit breaker of all Battery Modules
via the battery detection cable simultaneously. Refer to the diagram below for details.

Figure 2-10a: Activation of Remote Emergency Power Off function using a contact normally open switch.

Figure 2-10b: Activation of Remote Emergency Power Off using a contact normally closed switch.

3

EX 5/7/11RT Systems

Installation

2 — 12

86-86000-00 B00

5 4 3 2 1

6

5VDC to 27VDC

10mA (max.)

RJ 11

+

_

Connections provided by user.

3

5 4 3 2 1

6

RJ 11

+

_

Connections provided by user.

5VDC to 27VDC

10mA (max.)

3

Advertising
This manual is related to the following products: