Figure a.6, Insert cable into the copper tube. see figure a.6, Installation – Lincoln Electric IDEALARC CV-300 User Manual

Page 15

Advertising
background image

A-8

INSTALLATION

IDEALARC CV-300

A-8

6.

Tighten the set screw(s) to collapse the tube. The
screw(s) must apply firm pressure against welding
cable. The top of the set screw(s) will be nearly
flush or below the surface of the brass plug after
tightening.

7.

Slide rubber boot over brass plug. The rubber boot
must be positioned to completely cover all electri-
cal surfaces after the plug is locked into the recep-
tacle.

FIGURE A.6 - Installing Twist-Mate Cable Plug.

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

WELDING CABLE

BOOT

BRASS PLUG

COPPER TUBE

SET SCREW
(70-95 SIZE MAY HAVE
2 SET SCREWS)

SEE

ABOVE

TRIM

Advertising