Troubleshooting & repair, Scr removal and replacement (continued) – Lincoln Electric IDEALARC CV-300 User Manual

Page 81

Advertising
background image

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

PROCEDURE FOR CLAMPING
1/4-28 BOLTS.

Note: This procedure can only be used
with 1/4-28 bolts.

Do not use bolts with any other type
thread or new SCR will be damaged.

Do not over tighten cap screws. The
leaf spring will apply the required clamp-
ing force to the SCR.

1.

Do not turn the nuts. While holding
nuts stationary, turn the cap screws
only with the following procedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/2 turn.

6.

Tighten first cap screw 1/2 turn.

7.

Tighten second cap screw 1/4 turn.

8.

Assembly now has the proper
clamping force.

9.

Perform

Active SCR Test.

CLAMPING PROCEDURE FOR
1/4-20 BOLTS.

Note: This procedure can only be used
with 1/4-20 bolts.

Do not use bolts with any other type
thread or new SCR will be damaged.

Do not over tighten cap screws. The
leaf spring will apply the required clamp-
ing force to the SCR.

1.

Do not turn the nuts. While holding
the nuts stationary, turn the cap
screws only with the following pro-
cedures.

2.

Tighten first cap screw 1/4 turn.

3

Tighten second cap screw 1/2 turn.

4.

Tighten the first cap screw 1/2 turn.

5.

Tighten the second cap screw 1/4
turn.

6.

Tighten the first cap screw 1/8 turn.

7.

Tighten the second cap screw 1/8
turn.

8.

Assembly now has the proper
clamping force.

9.

Perform the

Active SCR Test.

F-42

TROUBLESHOOTING & REPAIR

F-42

IDEALARC CV-300

SCR REMOVAL AND REPLACEMENT (CONTINUED)

Advertising