Theory of operation, Power supply operation (continued), E-2 idealarc cv-300 – Lincoln Electric IDEALARC CV-300 User Manual

Page 35

Advertising
background image

E-2

THEORY OF OPERATION

E-2

IDEALARC CV-300

OUTPUT RECTIFICATION, FILTERING,
CONTROL AND FEEDBACK

The main transformer secondary windings are con-
nected to an SCR/Diode hybrid rectifier bridge. This
three phase AC output from the main transformer sec-
ondary is rectified and controlled through the rectifier
bridge. Output current and voltage are sensed at the
shunt and the output terminals and fed back to the con-
trol board. This feedback information is processed in
the control board. The control board compares the
commands of the output control potentiometer (or
remote control) with the feedback information and
sends the appropriate gate firing signals to the rectifier
bridge. The control board also supplies power and sig-
nals to the meter board.

The capacitors and the output choke provide the filter-
ing for the controlled DC output of the CV 300
machine. The choke is tapped for supplying either a
soft (high inductance) or a more harsh (low induc-
tance) welding arc.

Figure E.3 - Output Rectification, Filtering, Control and Feedback

POWER SUPPLY OPERATION (CONTINUED)

INPUT

LINE

SWITCH

MAIN

TRANSFORMER

RECONNECT

PANEL

FAN

MOTOR

OUTPUT

RECTIFIER

+

SHUNT

CHOKE

OUTPUT
TERMINALS

CONTROL BOARD

F

E

E

D

B

A

C

K

G
A
T
E
S

METER

OUTPUT

CONTROL

14 PIN

AMPHENOL

TRIGGER AND REMOTE

12VAC

12VAC

4
2
V
A
C

-

CAPACITORS

+

F

E

E

D

B

A

C

K

-

-

115VAC

NOTE: Unshaded areas of Block Logic

Diagram are the subject of discussion

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Advertising