Installing mg 1000b hardware – Nortel Networks NN43001-314 User Manual

Page 249

Advertising
background image

Installing MG 1000B Hardware

249

Figure 90
Confirm IP telephony node values SIP Redirect Server

Installing MG 1000B Hardware

To upgrade the hardware for an Option 11C Chassis, perform the following
steps:

Power down the chassis.

Remove the SSC card as described in Procedure 3.

Destroy or return the SSC security device to your local Nortel Repairs/
Returns center.

Install the DSP Daughterboard on the MGC card as described in
Installing a DSP Daughterboard.

Install the MGC card as described in Removing the SSC card.

Install the CP PM as described in Installing the CP PM card.

Cable the cards as shown in “Cabling the cards”.

Power up the MG 1000E.

Enter the ‘mgcsetup’ menu and configure the IP parameters, then
reboot the MGC.

If the Centralized Software Upgrade (CSU) feature is enabled on the Call
Server, the firmware for the MGC is downloaded automatically (or if the
internal Compact Flash is blank), otherwise initiate the firmware download
using Overlay 143 commands.

Nortel Communication Server 1000

Branch Office Installation and Commissioning

NN43001-314

01.02

Standard

Release 5.0

20 June 2007

Copyright © 2007, Nortel Networks

.

Advertising