Installation – Teledyne 6600 User Manual

Page 15

Advertising
background image

Oil in Water Analyzer

Part I: Control Section

Part I: 2-1

Teledyne Analytical Instruments

Installation

Installation of Model 6600 Analyzers includes:

1. Unpacking, mounting, and interconnecting the Control/Analysis

Section

2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.

This chapter covers installation of the Control Section. (Installation of

the Analysis Section is covered in Part II of this manual.) The Oil in Water
application is covered in Part III.

2.1

Unpacking the Control/Analysis Unit

The analyzer is shipped with all the materials you need to install and

prepare the system for operation. Carefully unpack the Control/Analysis
Unit and inspect it for damage. Immediately report any damage to the ship-
ping agent. Figure 2-2: Required Front Door Clearance

Allow clearance for the door to open in a 90-degree arc of radius 15.5

inches. See Figure 2-2.

Figure 2-2: Required Front Door

Clearance

2.2

Electrical Connections

Figure 2-3 shows the Control/Analysis Unit interface panel. Connec-

tions for power, communications, and both digital and analog signal outputs
are described in the following paragraphs. Wire size and maximum length
data appear in the Drawings at the back of this manual.

15

.5