YORK INTERNATIONAL

FORM 201.19-NM1 (204)

FIG. 6 – PIPEWORK ARRANGEMENT

Pipework and fi ttings must be separately supported to
prevent any loading on the evaporator. Flexible con-
nec tions are recommended which will also minimize
transmission of vibrations to the building. Flexible
connections must be used if the unit is mounted on
anti-vibration mounts as some movement of the unit
can be ex pect ed in normal operation
.

Pipework and fi ttings immediately next to the evapora-
tor should be readily de-mountable to enable cleaning
be fore operation, and to facilitate visual inspection of
the exchanger nozzles.

The evaporator must be protected by a strainer, pref-
er a bly of 30 mesh, fi tted as close as possible to the
liq uid inlet connection, and provided with a means
of local isolation.

The evaporator must not be exposed to fl ushing veloci-
ties or debris released during fl ushing. It is recommended
that a suitably sized by-pass and valve arrangement is
in stalled to allow fl ushing of the pipework system. The
by-pass can be used during maintenance to isolate the
heat exchanger without disrupting fl ow to other units.

Thermometer and pressure gauge connections should
be provided on the inlet and outlet connections of each
evaporator.

Drain and air vent connections should be provided at all
low and high points in the pipework to permit drain age
of the system and to vent any air in the pipes.

Liquid systems at risk of freezing, due to low ambient
temperatures, should be protected using insulation and
heater tape and/or a suitable glycol solution. The liquid
pump(s) must also be used to ensure liquid is cir cu lat ed
when the ambient temperature approaches freez ing
point. Insulation should also be installed around the
evaporator noz zles. Heater tape of 21 watts per meter
un der the insulation is recommended, supplied in de -
pen dent ly and controlled by an ambient temperature
ther mo stat set to switch on at 37°F (21°C) above the
freez ing tem per a ture of the liquid.

The liquid circulation pump must be controlled by the
unit. This will ensure that when the liquid temperature
falls within 3° or 5°F (2° or 3°C) of freez ing, the pump
will start.

The evaporator is protected by heater mats un der the in-
su la tion which are supplied from the unit con trol system
pow er supply. Dur ing risk of freezing the control sys tem
should be powered to provide the freeze pro tec tion func-
tion un less the liq uid systems have been drained.

Any debris left in the water pipework
be tween the strain er and evaporator
could cause se ri ous damage to the
tubes in the evaporator and must be
avoided. The in stall er/user must also
en sure that the quality of the wa ter
in cir cu la tion is ad e quate, with out
any dis solved gas es which can cause
ox i da tion of steel parts within the
evaporator.

WATER TREATMENT

The unit performance given in the Design Guide is based
on a fouling factor of 0.00025 ft

2

hr°F/Btu (0.044m2/hr

°C/kW). Dirt, scale, grease and cer tain types of water
treat ment will ad verse ly affect the heat ex chang er sur-
fac es and there fore unit per for mance. Foreign mat ter
in the water system(s) can increase the heat ex chang er
pres sure drop, reducing the fl ow rate and caus ing po-
ten tial damage to the heat exchanger tubes.
Aerated, brackish or salt water is not recommended for
use in the water system(s). YORK recommends that a
wa ter treatment specialist is consulted to determine the
proposed water composition will not affect the evap o -
ra tor materials of carbon steel and copper. The pH val ue
of the water fl owing through the evaporator must be kept
be tween 7 and 8.5.

Installation

LD04739

Pipework

Isolating Valve - Normally Open

Isolating Valve - Normally Closed

Flow Regulating Valve

Flow Measurement Device
Strainer

Pressure Tapping

Flanged Connection

Flow Switch

Water

Out

Water

In