Introduction – ACU-RITE MILLPWR Auxiliary User Manual

Page 4

Advertising
background image

AMI with Spindle Control Reference Manual

1

Introduction

This manual discusses how the Auxiliary Machine Interface (AMI) system works
in conjunction with the ACU-RITE

®

MILLPWR

®

system.

Preparation

Read and understand all instructions in this manual before beginning the instal-
lation. Each item has an overview section which will explain their capabilities
and will help ensure that each system is installed properly.

Before you begin, ensure the location where you are planning installation, can
fully support the power supply requirements that are identified in the Electrical
Specifications section at the end of this manual.

Tools

A typical AMI installation will require the following tools:

• Small, flat-tipped screwdriver
• Wire stripper
• Size “F” drill (0.257" diameter)
• 5/16"-18 tap

Advertising
This manual is related to the following products: