Chapter 7: Roof Assembly

Figure 7-34 Securing the overlapping upper and lower panels

A

Lower roof panel (CTR-0265)

D

5/16-18 x 1 flange bolt with sealing washer (S-
10260)

C

Upper roof panel (CTR-0264)

E

5/16 in. flange nut (S-3611)

14.Working in a clockwise direction, repeat the procedure to continue installing all the lower roof panels

and the upper roof panels onto the A-frames.

15.Field drill holes (B) into the roof panels (A) through holes in the top flange of the purlins (D). Fasten

the panels and the purlins securely using 5/16 in. bolts.