Chapter 7: roof assembly – Grain Systems Tanks PNEG-4075 User Manual

Page 79

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-8 Installing a temperature cable bracket

A

Roof rafter

D

Left purlin clip (CTR-0099)

B

10 in. temperature cable bracket (CTR-0013)

E

1/2 x 1-3/4 in. flange bolt (S-10252)

C

Right purlin clip (CTR-0100)

F

1/2 in. flange nut (S-10253)

3. Install a quick link (C) to each cable bracket (B) to support the temperature cables.

IMPORTANT: Do not attach weights to the temperature cables; secure the bottom of cables to the

floor with light twine. No roof rafter shall support more than one cable.

Pneg-4075 75 Ft Diameter 40-Series Bin

79

Advertising