Chapter 7: roof assembly – Grain Systems Tanks PNEG-4075 User Manual

Page 115

Advertising
background image

Chapter 7: Roof Assembly

3. Place a strip of rope caulk (D) along the edge of the installed roof flashing (A) where the next roof

flashing will overlap.

4. Align the holes along the edge of the next roof flashing (A) with the previously installed roof flashing

holes.

5. Install flange bolts (B) and flange nuts (C), securing the two roof flashing sections (A) together.

6. Install flange bolts (B) and flange nuts (C), securing the roof flashing section (A) to the roof panel ribs.

7. Continue installing the remaining flashing until the gap between the center collar and roof panels is

covered.

NOTE: Remember to place caulk between the overlap of the last two panels.

Figure 7-36 Installation of remaining roof flashing sections

A

Roof flashing (CTR-0266)

C

5/16 in. flange nut (S-3611)

B

5/16-18 x 1 flange bolt with sealing washer
(S-10260)

D

Rope caulk

Pneg-4075 75 Ft Diameter 40-Series Bin

115

Advertising