Chapter 7: roof assembly – Grain Systems Tanks PNEG-4075 User Manual
Page 120
Figure 7-39 Installing the cap plates
I
Long center collar channel (CTR-0080)
N
3/8 x 1 in. bolt with sealing washer (S-7487)
J
Splice plate (CTR-0020)
O
Vendor lifting eyebolt
K
Tube caulk
P
3/8 in. nut (S-456)
L
Side cap plate (CTR-0019), approximately
158 lb (71.6.4 kg)
Q
Center cap plate (CTR-0017), approximately 304
lb (137.89 kg)
M
3/8 x 1 in. bolt with sealing washer (S-
7487)
22.Place a continuous bead of tube caulk (V) on the mating surface of the roof flashing.
NOTE: Before continuing, read and understand the safe and proper lifting procedures needed to
install the A-frames. For more information, see
Guidelines for Assembling and Lifting the A-
Frame Rafter Sections, page 99
23.Attach the appropriate lifting chains (R) to the previously installed lifting eyebolts.
24.Attach the appropriate lifting chains (R) to the appropriate lilting device (S).
25.Use the appropriate lifting device (S) and qualified personnel to hoist the cap plate assembly (W)
into place.
120
Pneg-4075 75 Ft Diameter 40-Series Bin