3 how to install, 1 how to install option in frequency converter – GE Industrial Solutions AF-650 GP PROFINET User Manual

Page 7

Advertising
background image

3 How to Install

3.1.1 How to Install Option in Frequency

Converter

Items required for installing a network option in the
frequency converter:

-

The network option

-

Network option adaptor frame for the AF-600 FP/
AF-650 GP. This frame is deeper than the
standard frame, to allow space for the network
option beneath

-

Strain relief (only for unit sizes 11 and 12)

Illustration 3.1

Illustration 3.2

Instructions:

-

Remove keypad panel from the AF-600 FP/AF-650
GP.

-

Remove the frame located beneath and discard it.

-

Push the option into place. The Ethernet
connectors must be facing upwards.

-

Remove both knock-outs on the network option
adaptor frame.

-

Push the network option adaptor frame for the
AF-600 FP/AF-650 GP into place.

-

Replace the keypad and attach cable

NOTE

Do not strip the Ethernet cable and ground it via the strain
relief-plate! The grounding of screened Ethernet cable is
done through the RJ-45 connector on the option.

NOTE

After installing the OPCPRT option, be aware of the
following parameter settings:
O-01 Control Site: [2] Controlword only or [0] Digital and ctrl.
word
O-02 Control Word Source
: [3] Option A

How to Install

PROFINET Operating Instruction

6

3

3

Advertising