2-2

MECHANICAL INSTALLATION

LS300 User’s Guide

4.)

Remove other in-line leak detection equipment before installing the LSU300 Auto-Learn LLD

5.)

Apply UL Classified Gasoline/Oil resistand teflon pipe dope thread sealant to the threads of the

LSU300 Transducer and use a 2-3/8 inch open-end wrench to install it in the Leak Detector Port of

the STP housing (see Figure 2-2)

6.)

Apply UL Classified Gasoline/Oil resistand teflon pipe dope thread sealant, assemble, and install the

supplied Needle Valves in the Line Pressure Test Port of the STP and close all Needle Valves (see

Figure 2-2)

7.)

Install Couplings, threaded Rigid Metal Conduit (RMC), and Explosion/Weather Proof Junction

Boxes (J-Boxes) in the STP sumps (see Figure 2-2).

8.)

Install threaded RMC and EYS fittings along with Transducer Cables (Belden #9365) from LS300

console to the Explosion/Weather Proof J-Boxes (have the licensed electrician splice the cables

together. If this wiring is Intrinsically Safe it MUST NOT be run with any Explosion Proof wiring or

other non-Intrinsically Safe wiring!).

9.)

After all LSU300 Leak Sensing Units (transducers) have been installed, check to see that all Needle

valves are closed, and that the system is ready to be pressurized to check for the absence of leaks.

10.)

After the installation is checked and all personnel are clear, have the electrician turn on power at the

Power Panel for the STP (Submerged Turbine Pumps and Dispensers).

11.)

Turn on the STP at the dispenser (do not deliver product) and check for leaks at each Sump... if

there are any leaks, immediately turn off power, lockout and tag at the Power Panel, use absorbent

rags to clean up the product spills and dispose of properly, and repair the leak(s) and repeat step 10

and step 11 until no leaks remain.

13.)

Clean areas where the Danger Labels will be placed so the adhesive backing will stick to a dry

surface that is clean and free of petroleum.

14.)

Cleanup and dispose of installation materials, petroleum absorbent and waste material in

appropriate containers.

15.)

Stick the supplied Danger Labels (PN: 240-1175) to clean dry areas near

Dispenser Fuel Filters, Pump Controllers, and on the Cable of the

LSU300 Transducer and on the STP housing.

FIRE, EXPLOSION &

ELECTRICAL SHOCK HAZARD

Electronic line leak detector

installed—the pump may start at any

time and pressurize the fuel lines.

• BEFORE performing any

installation or service — turn off/
lock out electrical power sources
to the submersible pump(s), and
relieve fuel-line pressure.