Rapid-Air CUT-TO-LENGTH WITH MULTI-STROKE User Manual

Page 30

Advertising
background image

Cut to Length with Multi Stroke Program

ROLLER AND GEAR BOX ASSEMBLY

At this stage of disassembly, all field maintenance components are exposed
and easily accessible. No further field service should be necessary on the
roller and gear box assembly unless the gear train is suspected of a
malfunction. The drive rolls should be checked for erronious wear pattern
while they are exposed and cleaned before reassembly.

MAINTENANCE PROCEDURES

DAILY WEEKLY
MONTHLY

Wipe off feed rolls Check wear pattern of rolls Check oil
level

Clean any dirt from Check
cables for cuts

servo unit or wear

Clean any dirt from

operators pendant

file:///C|/Web_develop/cut_to_length_with_multi_stroke_.htm (29 of 66) [12/10/2001 3:44:57 PM]

Advertising