Fig. 7. allow seated anchor to cure – Triton RL5000 Installation Manual User Manual

Page 31

Advertising
background image

3 1

BOLT CASH DISPENSER

TO FLOOR

1.

Ensure the cabinet is as level as
possible given the floor conditions.
Use a bubble level to verify this. If
a bubble-level is not available, the
cabinet can be “rocked” gently
from front-to-back and side-to-side
to check the need for leveling. Use
a screwdriver to adjust the leveling
bolts inside the unit to level the
cabinet. DO NOT extend the feet
any further than necessary to level
the cabinet.

8.

Repeat steps 1-7 for each of the
remaining mounting holes.

9.

Allow the adhesive to cure for the
specified time (see chart below)
prior to applying any load to the
anchors. During the winter, the hole
temperature may be different than
the room temperature! The hole
temperature should be measured to
determine the curing time required.
DO NOT disturb or load the
anchors until they are fully cured!

*

e

r

u

t

a

r

e

p

m

e

T

l

a

i

r

e

t

a

M

e

s

a

B

e

m

i

T

g

n

i

t

t

e

S

r

e

v

o

d

n

a

C

º

0

2

/

F

º

8

6

s

e

t

u

n

i

m

0

2

C

º

0

2

/

F

º

8

6

o

t

C

º

0

1

/

F

º

0

5

s

e

t

u

n

i

m

0

3

C

º

0

1

/

F

º

0

5

o

t

C

º

0

/

F

º

2

3

r

u

o

h

1

C

º

0

/

F

º

2

3

o

t

C

º

5

-

/

F

º

3

2

s

r

u

o

h

5

C

º

5

-

/

F

º

3

2

o

t

C

º

0

1

-

/

F

º

4

1

s

r

u

o

h

0

1

Fig. 7. Allow seated anchor to cure.

C

ABINET

I

NSTALLATION

- C

HEMICAL

A

NCHORS

Advertising