Startłup inspection form – Baldor GLC GENERATOR GLC45 User Manual

Page 109

Advertising
background image

Series GLC A-33

MN2408

Start–up Inspection Form

It is required that both sides of this form be completed, signed where indicated and

returned to Baldor Generators within 30 days of initial Start–up and test.

It is your responsibility to deliver copies to:

n Baldor Generators Factory n Baldor Distributor n Customer

For Standby, Automatic Emergency and Prime Power Generators

Distributor Information

End User / Owner Information

Name:

Name:

Address:

Address:

Phone:

Phone:

Model Number:

Job Number:

_______

RPM _______ Hz _______ P.F.

Standby

Continuous

_______

kW _______ Volts

_______

KVA _______ Amps.

Engine Model #:

Generator Model #:

Engine Serial #:

Generator Serial #:

List Items Installed by Distributor:

List Items Installed by Others:

Engine Hour

Meter

Power

Output kW

Voltage (Phase-to-Phase)

Current

Oil Temp.

Oil

Pressure

Water

Temp

Ambient

Temp

Meter

Output kW

No Load

1-2

2-3

3-1

1

2

3

Hz

Pressure

Temp.

Temp.

Start-up Performed by:

Address:

Phone:

Date:

Technician:

Customer Signature:

Advertising