Example: Determining Pipe Size for LPG

A generator has a 16Hp engine 60 feet from the supply.

Determine the supply pipe size for Natural Gas fuel.

16 x 10,000 = 160,000 BTU’s / per hour for proper operation.

160, 000

2, 516 +

63.5 cubic feet per hour.

From Table 3-6, a 60 foot run requires a minimum 1” pipe at full engine load.

LP Gas Connections (vapor withdrawal only)

The LPG connections should only be made if your generator is setup to run on LPG. If it is setup

to run on Natural Gas, contact your Baldor representative and do not continue with installation.

The incoming pressure must be 11 inches water column (6 oz. pressure).

Table 3-6 LP Gas Flow Rate (Cubic Feet per Hour) per Pipe Length

Pipe

Length

Iron Pipe Size

Length

(Feet)

1

/

2

3

/

4

1

1–

1

/

4

1–

1

/

2

2

2–

1

/

2

3

4

6

8

15

48

109

218

475

772

1570

2437

4115

8786

24497

50007

30

33

76

153

339

538

1127

1741

2975

6140

17325

35353

45

27

63

126

275

443

934

1456

2469

5001

14781

28865

60

24

54

110

241

386

817

1266

2184

4304

12236

25004

75

49

98

218

345

709

1108

1899

3798

10957

22345

90

44

89

196

310

633

987

1709

3482

10001

20414

105

41

83

180

285

582

905

1551

3228

9254

18895

120

76

171

266

544

848

1456

3038

8659

17673

150

69

153

241

494

772

1323

2754

7748

15825

180

63

142

222

456

709

1234

2532

7064

14432

210

58

130

202

418

652

1127

2342

6439

13356

240

120

190

393

614

1063

2209

6077

12405

270

113

180

367

576

1000

2057

5697

11780

300

108

171

345

544

943

1899

5381

11179

Note: Almost all operation problems are related to the installation techniques used.

Do Not guess, be sure pipe size is adequate for required flow rate.

1.

Connect the proper size gas pipe at the input to the LP Gas regulator. Connect the

LPG pipe line shown in Figure 3-3 using the correct size pipe for the required flow rate

and length of pipe. Refer to Table 3-6 for pipe size. Be certain that all connections are

sealed and no leaks are present. The installer must ensure that all gas connections

comply with all building codes.

2.

Verify Fuel Supply Pressure

Prior to initial operation of generator, verify that fuel system pressure is 11

″ Water

Column (6 oz. pressure) and fuel pipe sizes comply with Table 3-6.

3.

Proceed to Electrical Connections.