2 service brake valve, Section 8.11.2, “service brake valve, Service brake valve – JLG G5-18A Service Manual User Manual

Page 104

Advertising
background image

Hydraulic System

8-14

G5-18A, 2505H, 25.5

e. Main Control Valve Assembly

Note: ALWAYS replace seals, o-rings, gaskets, etc.,
with new parts to help ensure proper sealing and
operation. Lubricate seals and o-rings with clean
hydraulic oil.

Assemble each Valve Section

1. Reassemble any plugs, check valves, compensator

valves, anti-cavitation valves, shock valves or
hydraulic remote positioners from individual valve
sections if equipped.

2. Install the end covers onto Lift/Lower and Crowd

sections.

Assemble the Main Control Valve

1. Place all three tie rods with the washers and nuts

through the end main control valve section.

2. Stand the end main control valve section on end.

3. Install proper o-rings on the inner face of the end

main control valve section. Align the Crowd section
over the three tie rods and slide onto the end main
control valve section.

4. Using proper o-rings and load sense shuttle, repeat

step three for the remaining sections.

5. Install the washers and nuts on the tie rods and

torque to 18.5 lb-ft (25 Nm).

f.

Main Control Valve Installation

1. Loosely install the four main control valve mounting

bolts through bracket on the rear of the machine.

2. Install the main control valve onto the bracket,

aligning the bolts with the holes in the end sections
of the main control valve. Slide the main control
valve into position, and tighten the bolts.

3. Prime the main control valve by filling the inlet

openings with fresh, filtered hydraulic oil from a
clean container, before attaching the hoses.

4. Use new oiled o-rings as required. Uncap and

reattach and secure all hoses, clamps, etc. to the
main control valve.

5. Check the routing of all hoses, wiring and tubing for

sharp bends or interference with any rotating
members, and install tie wraps and/or protective
conduit as required. Tighten all tube and hose
clamps.

6. Properly connect the battery.

7. Start the engine and run at approximately one-third

to one-half throttle for about one minute without
moving the machine or operating any hydraulic
functions.

8. Inspect for leaks and check the level of the hydraulic

fluid in the reservoir. Shut the engine OFF.

9. Wipe up any hydraulic fluid spillage in, on, near and

around the machine, work area and tools.

10. Install the rear panel.

11. Close and secure the battery and engine covers.

12. Remove the Do Not Operate Tags from both the

ignition key and the steering wheel.

g. Main Control Valve Test

Conduct a pressure check of the hydraulic system in its
entirety. Adjust pressure(s) as required. Refer to Section
8.6.2, “Main Control Valve Pressure Checking.”

8.11.2

Service Brake Valve

The service brake valve is at the base of the steering
column support, concealed by the lower dash cover.

The service brakes themselves are part of the front axle.
Refer to Section 5.8, “Brakes,” for further information.

a. Service Brake Valve Removal

1. Park the machine on a firm, level surface, fully

retract the boom, lower the boom, place the
transmission control lever in (N) NEUTRAL, engage
the park brake and shut the engine OFF.

2. Place a Do Not Operate Tag on both the ignition key

switch and the steering wheel, stating that the
machine should not be operated.

3. Open the battery and engine covers. Allow the

system fluids to cool.

4. Properly disconnect the battery.

5. Remove the necessary dash panels.

Advertising
This manual is related to the following products: