3 second boom section removal, Second boom section removal – JLG G5-18A Service Manual User Manual

Page 37

Advertising
background image

3-5

G5-18A, 2505H, 25.5

Boom

10. Uncap and reconnect extend/retract cylinder fittings

and plugs to extend/retract cylinder tubes and
tighten until wrench-tight. Mark fitting, then torque to
specification. Refer to Section 2.2.3, “Hydraulic
Hose Torque Chart.”

11. Uncap and reconnect tilt hoses and (if equipped)

auxiliary hoses. Attach both sets to their appropriate
fittings until wrench-tight. Mark fitting, then torque to
specification. Refer to Section 2.2.3, “Hydraulic
Hose Torque Chart.”

12. Raise boom to height that allows for installation of

compensating cylinder, pin (8) and lock bolt (9).
Apply locking compound and torque to
66 lb-ft (90 Nm).

13. Adjust and shim each wear pad as needed.

14. Start engine and operate all boom functions several

times to bleed any air out of hydraulic system.

15. Check for fluid leaks.

16. Check the hydraulic fluid level in tank and add fluid

as required.

17. Clean up all debris, hydraulic fluid, etc., in, on, near

and around the machine.

18. Close and secure engine cover.

19. Remove Do Not Operate Tags from both ignition key

switch and the steering wheel.

20. Install previously removed attachment to quick

attach assembly.

3.4.3

Second Boom Section Removal

1. Remove any attachment from quick attach assembly.

2. Be sure there is enough room in front of machine to

allow boom sections to be removed.

3. Park machine on a hard, level surface.

4. Fully retract boom, lower boom, place transmission

control lever in (N) NEUTRAL.

5. Engage park brake and shut engine OFF.

6. Place a Do Not Operate Tag on both ignition key

switch and steering wheel.

7. Properly disconnect battery.

8. Open engine cover. Allow system fluids to cool.

9. Remove quick attach assembly. Refer to Section

3.6.1, “Quick Attach Assembly Removal.”

10. Label and disconnect tilt hoses and (if equipped)

auxiliary hydraulic hoses attached to machine at
boom head. Plug and cap hose ends to prevent dirt
and debris from entering hydraulic system.

Note: Tag or identify each hose to corresponding fitting
it was removed from.

11. Label and disconnect extend/retract hydraulic tubes

on extend/retract cylinder at the rear of boom. Plug
and cap hose ends to prevent dirt and debris from
entering hydraulic system.

12. Remove top and side wear pads from rear of second

boom section.

Note: Tag each pad, backing plate, shim and bolts from
each location.

13. Remove lock bolt and nut (10) from rear of

extend/retract cylinder.

14. Remove extend/retract cylinder mounting pin (11).

15. Support front of boom by placing a sling behind

boom head.

MY8570

9

8

MY1960

11

10

Advertising
This manual is related to the following products: