5 lsi-can check pt, Lsi-can check pt, R to section 9.11.5, “lsi-can check pt – JLG G5-18A Service Manual User Manual

Page 151

Advertising
background image

9-31

G5-18A, 2505H, 25.5

Electrical System

8. Press the SYSTEM CHECK button on the LSI

display and release. As the calibration point is
recorded, buzzer sounds and the LEDs will flash and
perform a sequence until all are flashing.

9. Perform the LSI- CAN Check PT to finalize the

calibration. Refer to Section 9.11.5, “LSI-CAN Check
PT.”

Note: The following procedure MUST BE performed to
finalize the LSI System Calibration.

9.11.5

LSI-CAN Check PT

With the LSI calibrated, the UGM also needs calibrated
and verified.

1. The machine must be on a level surface, wheels

steered straight and park brake ON.

2. Connect the analyzer cable connector to the

connector at the right rear corner of the cab by the
operator seat.

3. Start the machine.

4. Press the “C” and “OK” buttons simultaneously on

the analyzer.

5. Go to “ACCESS LEVEL 3” and press “OK”.

6. Enter the proper access code and press “OK”.

7. “ACCESS LEVEL 2” is now visible.

8. Go to “CALIBRATIONS” menu, press “OK”.

9. Scroll to “LSI_CAN CHECK PT”.

10. “SET LSI_CAN CHECK POINT”, use the arrow keys

to change “NO” to “YES”.

11. Follow and execute the screen instructions:

a. “Remove Weights and Attachments”, press “OK”.

b. “TELESCOPE IN and FULLY LIFT UP”, press

“OK”.

c. “STOP, WAIT ONE MINUTE”, wait at least one

minute and press “OK”.

d. “PRESS ENTER TO SET CHECK POINT”, press

“OK”

e. Screen defaults back to “CALIBRATIONS:

LSI_CAN CHECK POINT”.

f. Press “C” for approximate two seconds to return

to normal display screen.

g. LSI Can Check is now complete.

12. Remove the analyzer.

13. Return machine to service.

Advertising
This manual is related to the following products: