3 establishing the tubing connections, 1 installing the fourfold micro dosing tip, Establishing the tubing connections – Metrohm 894 Professional CVS User Manual

Page 37: Installing the fourfold micro dosing tip

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

894 Professional CVS

■■■■■■■■

27

3.3

Establishing the tubing connections

Depending on the peripheral devices you are using with the measuring
instrument (manual, semiautomated or automated determinations), differ-
ent tubing connections have to be established. All tubing connections that
can be used are described below.

3.3.1

Installing the fourfold micro dosing tip

The fourfold micro dosing tip (6.1824.000) can be used to connect the
894 Professional CVS to dosing devices of the type 800 Dosino and to
dose auxiliary solutions and standard solutions automatically. Information
on the electrical connection of dosing devices can be found in Chapter
3.4.2, page 40
.

Installing a fourfold micro dosing tip in the RDE measuring
head

Proceed as follows:

1 Remove the stopper from the screw nipple of the threaded opening

(5-16).

2 Loosen the screw nipple in the threaded opening a little.

This slightly loosens the O-ring located on the bottom of the screw
nipple.

3 Feed the fourfold micro dosing tip through the opening from below

(5-14).

4 Insert the fourfold micro dosing tip into the screw nipple of the

threaded opening (5-16) until it stops.

Advertising