SETUP AND PROGRAMMING

CHAPTER 3

3-25

Back panel connections


A

Manual

Loader

B

Solenoid control cable

C Suretest
D

Smart 4-in-1 transducer

E Transducer

cable

F

Smart single transducer

G Analog

Output

H

Foot cable switch

I

Power cables (110/220 VAC)

J Printer

cable

K

Personal computer cable

Note: Cable (K) can be connected to Printer Port too.



Setting Up the

SURETEST

Torque Calibration System


1.

Position the roll cabinet on a level floor and lock the wheels.


2.

Mount the indicator stand, part number 2000-111-0, to the Loader.


3.

Mount

the

SURETEST base uint to the stand.


4.

Connect the solenoid control cable between the Suretest and Loader.


5.

Install the appropriate SURETEST transducer to the Loader drive.


6.

Install two (2) quick release pins, part number 2000-195-12

7.

Connect the transducer cable, part number 2000-900-120, between the Indicator and
transducer.

8.

Select the appropriate AC voltage input at the rear of the Loader. Connect the AC power
cables to the Loader. For additional information refer to Chapter 6—Loader Rear Panel
Controls.


9.

Install the safety shield to the front of the Loader.


10.

Install the reaction pins into the reaction slide on the Loader.

11.

Install two Linear ball bearing, part number 2000-173-11.





For testing procedures refer to Chapter 4—Using the Torque Tester.