Powering the equipment, Base unit controls – CDI Torque SURETEST Torque Calibration System User Manual

Page 27

Advertising
background image

SETUP AND PROGRAMMING

CHAPTER 3

3-26

SURETEST

Base Unit Controls


Refer to the illustration below when performing the power-up and programming procedures.


Figure 3-2: SURETEST Controls

SURETEST Graphic LCD Display

Power

Switch

– Front Panel Membrane Function Keys

Powering the Equipment

To power the equipment, press the power button on the front of the SURETEST.

• At POWER ON, the SURETEST performs self-test and momentarily displays the results on the
display.


• With no transducer installed, the display then reads:


• When applying power with the transducer connected, or when connecting a transducer while the
power is on, the display momentarily reads:


ZEROTARE prompt

Advertising
This manual is related to the following products: