Chapter 3: Installation

The C360 switch is ready to work after you complete the installation instructions described in
this chapter. After you have completed the procedures in this chapter, proceed to

Chapter 4: Powering Up the Avaya C360

The following steps are described in this chapter:

Preparing Needed Tools

Site Preparation

Rack Mounting (Optional)

Wall Mounting (Optional)

Stacking (optional)

Making Connections to Network Equipment

Installing SFP GBIC Transceivers

Preparing Needed Tools

Prepare the tools you need to mount the Replace variable w/ short product name, according to
the

Table 5

:

Table 5: Mounting Tools

If you need to mount on...

Prepare these tools

Rack or wall

Phillips head screwdriver

Flat wall

screws to fasten Replace variable w/ short
product name to the wall

Uneven wall

16.3" x 18.3" (415 x 465 mm) plywood
board 0.8" (20 mm) thick
wood screws

screws to fasten the Replace variable w/
short product name to the wall