East Coast Supercharging ECS Paxton SC1500 C6 Supercharger Kit User Manual

Page 18

Advertising
background image

Install 3 in. rubber coupler onto intercooler

using supplied 3 in worm clamps. Do not
tighten worm clamps as of yet. We will be
fitting the charge tubes and will need to
adjust fitment as we go along.

Next, slide 3 in aluminum “U tube” to

coupler through end of radiator cradle and
attach with supplied ¼ x 1 in bolt to
mounting point on back side of radiator
cradle as pictured. (fig 52).


Next, take your fan assembly and notch the upper most right hand corner. From right side of shroud

measure approximately 4 ½ inches towards left and about a ½ in. down. Use the photos below as a
guide. (fig 53a,b).

Reinstall fans, being sure to tighten the 2 - 10mm bolts on either side and reconnecting the fan wiring

harness.

Reinstall oil lines previously removed from

radiator at this point of the installation. (Z51
equipped cars)

Install supplied tensioner with 9/16

th

bolt to

previously installed tensioner bracket as shown.
(fig 54)

52

53a

53b

54

clamps. Do not

Advertising