Adept Lynx Platform User Manual

Page 70

Advertising
background image

Adept Lynx Platform User's Guide, Rev B

Page 70 of 116

Chapter 6: Operation

Figure 6-2. Docking Station

Indicators, Controls, and Connections

The docking station has a power switch and two LEDs:

l

blue indicates that power is available.

l

yellow indicates that a charge is in progress.

The power plug for AC supply is on the right side of the station, as viewed from the front.
Power requirements are 100 - 240 VAC, 50 - 60 Hz, and 8 A.

The plug for connecting the manual charging cable is on the left side of the station, as viewed
from the front.

Advertising