5 confirming the stack height – ONICON F-1100 Series User Manual

Page 15

Advertising
background image

11451 Belcher Road South, Largo FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]
Turbine Flow Meter Manual 05/14 - 0721-3 / 13518

Page 15

3.3.5 Confirming the Stack Height

ONICON insertion flow meter stem lengths vary according to the pipe diameter and the

height of the installation hardware stack. ONICON records the stack height dimension

provided by the customer at the time of order entry, and the information is used to size the

stem. This dimension is shown on the laminated insertion depth gage tag attached to the

meter.

Prior to installing the meter, confirm that the stack height recorded on the tag is close to

the actual stack height. Flow meter stems are intentionally over sized to allow for

variations of at least 2” in the stack height. Contact ONICON prior to installation if there

is any question regarding stack height or stem length. This will allow ONICON to offer

you credit for your meter if you decide to exchange the meter for one with a different stem

length. Returns may be subject to a restocking fee.

Depth Gage

1) Pierce insulation until
gage tip touches pipe.

Lock Nut

READ OTHER SIDE OF THIS TAG BEFORE INSTALLING METER

DO NOT

USE FOR

ANY

OTHER METER

Insulation

Pipe

2) Insert flow meter until
bottom of electronics case
touches eye of depth gage.

3) Confirm arrow is
aligned with flow
and tighten lock nut.

GAGE LENGTH 10.937"

ST
ACK HEIGHT

8.5”

FOR S/N #250791

Flow Direction

THIS GAGE WAS CUT TO LENGTH

FOR THIS METER AND PIPE SIZE ONLY.

DO NOT USE FOR ANY OTHER METER OR OTHER PIPE SIZE.

This is not a complete installation procedure. Please see
the Installation and Adjustment Guide for complete
instructions and important safety information.

1500 North Belcher Road, Clearwater, Florida 33765 Tel (727) 447-6140

2057C-4

12-12

Advertising
This manual is related to the following products: