ONICON F-1100 Series User Manual

Page 25

Advertising
background image

11451 Belcher Road South, Largo FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]
Turbine Flow Meter Manual 05/14 - 0721-3 / 13518

Page 25

4.5 INLINE METER START-UP AND COMMISSIONING WORKSHEET

Please read all installation instructions carefully prior to proceeding with these steps. Wiring
diagrams are located in the appendix. Use the following worksheet for checking off the
commissioning steps and recording measured values:

STEP

TEST / MEASUREMENT

S/N: _______ S/N: _______ S/N: _______ S/N: ______

1

Meter location

2

Control system programming

3

Match display or BTU meter serial#
(if ordered)

4

Signal connections verified

5

Supply voltage verified

6

Connect power

The following steps require flow in the pipe. Flow signal readings should be taken while holding the flow rate
constant if possible; otherwise, take the various output readings as quickly as possible.

7

Frequency output(s):

Avg = green, Top = white
Bottom = orange

Avg Freq. (HZ):

Avg Freq. (VDC):

Hz

VDC

Hz

VDC

Hz

VDC

Hz

VDC

Calculated Flow Rate: GPM GPM GPM GPM

8

Analog or digital outputs

4-20 mA signal:

0-10 V signal:

MA

VDC

MA

VDC

MA

VDC

MA

VDC

Scaled output time interval or

divided output frequency

Calculated Flow Rate: GPM GPM GPM GPM

9

Flow rate displayed by control

system GPM GPM GPM GPM

Advertising
This manual is related to the following products: