Therm owell installation, Thermowell installation, Copper tees threaded tee welded pipe – ONICON System-10 P1 User Manual

Page 45

Advertising
background image

11451 Belcher Road South, Largo, FL 33773 • USA • Tel +1 (727) 447-6140 • Fax +1 (727) 442-5699 • [email protected]

System-10-P1 Manual 10/14 - 0656-9 / 18320

A - 3

12-5-01

0267

Therm

owell Installation

1500 No

rth Bel

cher Road

, Clearwate

r, Florida 33765

••••

••

••

••

••

••

••

•••

•••••••••••••••••••F

ax (727) 442-5699

ww

w

••

•••

••

••

••

•••••••••••••••••

: [email protected]

ONICON fu

rnished

Junction B

ox

ONICON fu

rnished

bushing w

ith

1/2" NPT outlet

NOTES:

1.

If

additional

fittings

are

required,

ensure

that

tip

of

thermowell

remains

in

flow

stream.

2.

Thermowell

length

varies

with

pipe

size.

Customer supplied

threaded tee

(outlet si

ze = line si

ze)

Copper

Tees

Threaded

Tee

Welded

Pipe

1/2" NPT

ONICON Fu

rnished

1" S

w

eat x 1/2" NPT

Flush Bushing

ONICON fu

rnished

Junction B

ox

IMPO

R

TANT

Use no additional bushings to ensure

that tip of the

rm

ow

ell is

inse

rted into fl

ow stream.

ONICON Fu

rnished

Copper

T

ee

With

1" Outlet

O

NI

CO

N

Furnishe

d

1/

2"

NPT

Welde

d

Branch

O

utle

t

5/8"

Minimum

Hole

Size

ONICON

furnished

Junction

Box

A-3

INC

O

RP

O

RA

TE

D

THERMOWELL INSTALLATION

Advertising