Eaton POWERWARE 9315 User Manual

Page 46

Advertising
background image

INSTALLING OPTIONAL ACCESSORIES

EATON Powerware

®

9315 UPS (500–750 kVA) Installation and Operation Manual

S 164201691 Rev 1 www.powerware.com

6-8

Connect to

Port 1 (DB-9) on

Customer Interface Panel

Fuse

Terminal
Block
(TB3)

Figure 6-6. Terminal Block Bracket

6.

Connect the SCM wiring to the terminal block using the terminations shown in
Table 6-4.

Table 6-4. SCM Wire Terminations

From SCM A

To UPS

Remarks

TB1-4

TB3-1

TB1-5

TB3-2

Twisted wires (4)

TB1-6

TB3-3

Twisted wires (4)

1–2 turns per 3”

TB1-7

TB3-4

From SCM B (If Used)

To UPS

Remarks

TB1-4

TB3-5

TB1-5

TB3-6

Twisted wires (4)

TB1-6

TB3-7

Twisted wires (4)

1–2 turns per 3”

TB1-7

TB3-8

7.

Contact your Eaton service representative for verification and testing of the SCM
and its connections prior to making connections to terminal strip TB2 shown in
Figure 6-7.

8.

Repeat Steps 1 through 7 if you are installing another SCM.

9.

Secure the access plate on top of the UPS Input/Rectifier cabinet.

Advertising