Above the ceiling (plenum) installations – Extreme Networks ALTITUDE 4700 User Manual

Page 22

Advertising
background image

Hardware Installation

Altitude 4700 Series Access Point Installation Guide

22

11

Rotate the access point chassis 45 degrees counter-clockwise. The clips click as they
fasten to the T-bar.

12

The access point is ready to configure. For information on basic access point device
configuration, see

“Basic 4700 Series Configuration” on page 31

.

NOTE

If the access point is utilizing remote management antennas, a wire cover can be used to provide
a clean finished look to the installation. Contact Extreme Networks for more information.

Above the Ceiling (Plenum) Installations

An above the ceiling installation requires placing the access point above a suspended
ceiling and installing the provided light pipe under the ceiling tile for viewing the rear
panel status LEDs of the unit. An above the ceiling installation enables installations
compliant with drop ceilings, suspended ceilings and industry standard tiles from .625
to .75 inches thick.

Advertising