background image

Hardware Installation

Altitude 4700 Series Access Point Installation Guide

24

4

Mark a point on the finished side of the tile where the light pipe is to be located.

5

Create a light pipe path hole in the target position on the ceiling tile.

6

Use a drill to make a hole in the tile the approximate size of the access point LED
light pipe.

CAUTION

Extreme Networks recommends care be taken not to damage the finished surface of the ceiling tile
when creating the light pipe hole and installing the light pipe.

7

Remove the light pipe’s rubber stopper (from the access point) before installing the
light pipe.

8

Connect the light pipe to the bottom of the access point. Align the tabs and rotate
approximately 90 degrees. Do not over tighten.

9

Fit the light pipe into hole in the tile from its unfinished side.

10

Place the decal on the back of the badge and slide the badge onto the light pipe from
the finished side of the tile.

11

Attach the antennas to their correct connectors.

For information on the antennas available to the access point, see

“Antenna Options”

on page 14

.

CAUTION

Ensure you are placing the antennas on the correct connectors to ensure the successful operation
of the access point.