Warning, C. install the termination cap, B. chase top – Heat & Glo Fireplace EXCLAIM-36T-C User Manual

Page 22

Advertising
background image

Heat & Glo • EXCLAIM-36C Woodburning Fireplace • 4013-093 Rev G • 08/06

22

Termination Cap

Storm Collar

Slope Downward

Turn-down

Drip Edge

Chase
(Chimney)

2 in. (51 mm) Collar
on Chase Top

Caulk

.018 (26 ga) min.
Galvanized
Chase Top

Figure 6.4

Chase Top Construction

Install the Chimney Air Kit (required in Canada):

When installing the chimney air kit, follow the instructions
provided with this accessory.

2 in. (51 mm) min. collar

6 in. (152mm) min.

2 in. (51 mm) min.

Storm Collar

Flashing Collar

Minimum 1-1/2 in. (38 mm) overlap of cap over pipe

Figure 6.5

Installing a TR444 Round Termination Cap

Storm Collar

Flashing Collar

Top of Pipe

14-1/2 in. (368mm) max.

1-1/2 in. (38 mm) min.
overlap

2 in. (51 mm) min.

Figure 6.6

Installing a TR442 Round Telescoping Termination Cap

Note: To protect against the effect of corrosion on those
parts exposed to the weather, the termination cap can be
painted with a rust-resistant paint.

Fire Risk
• The minimum overlap of cap to pipe

MUST be met or chimney may separate
from cap.

Separation allows sparks, heat and embers
to escape.

WARNING

C. Install the Termination Cap

For installations utilizing a TR442 Round Telescoping

Termination Cap, the uppermost chimney section must be
below the top of the chase top, but not more than 14-1/2 in.
(368 mm) below the top of the chase top. Minimum overlap
of chimney and termination cap must be 1-1/2 in. (38 mm).
See Figure 6.6.

Install the chimney sections up through the chase

enclosure. When using a TR444 Round Termination
Cap, the uppermost top section of pipe must extend 6 in.
(152 mm) above the top of the

À ashing collar to allow

installation of the storm collar and termination cap. See
Figure 6.5.

B. Chase Top

A metal chase top is required to seal the top of the chase
around the chimney pipe. The top should include a turn-
down and drip edge to prevent water from seeping into the
chase. Provide a 1/8 in. (3 mm) gap around the

À ue pipe

and slope the top downward away from the penetration. See
Figure 6.4.

• All seams must be caulked to prevent leaks.
• A chase installation must use a chase top. Chase tops

are available from your Heat & Glo dealer or may be

¿ eld

constructed.

• Attach the chase top to the top of the chase.

Advertising
This manual is related to the following products: