5 examples: replacing a system board, Examples: replacing a system board – Fujitsu Siemens Computers SPARC Enterprise M8000 User Manual

Page 102

Advertising
background image

4-12

SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User’s Guide • September 2007

7. Check the status of the move-destination domain and moved system board.

Execute the showdcl(8) command to check the operation status of the move-
destination domain, and then execute the showboards(8) command to check the
status of the moved system board.

4.5

Examples: Replacing a System Board

This section provides examples of operations to replace a system board in a domain.
The examples illustrate replacement of a system board in a Uni-XSB environment
and a system board in a Quad-XSB environment. In each sample operation, a
procedure conforming to

Section 4.1.4, “Flow: Replacing a System Board” on

page 4-5

, is used, and the system board shown in each figure is replaced using the

XSCF shell.

Note –

You cannot use DR to replace a system board in a midrange server because

replacing a system board replaces an MBU. To replace a system board in a midrange
server, you must turn off the power for all domains, then perform a hardware
replacement.

XSCF> showdcl -d 1

DID

LSB

XSB

Status

01

Running

00

01-0

01

00-1

XSCF> showboards 00-1

XSB

DID(LSB)

Assignment

Pwr

Conn

Conf

Test

Fault

-------------------------------------------------------------------

00-1

01(01)

Assigned

y

y

y

Passed

Normal

Advertising
This manual is related to the following products: