Bladecenter t networking guidelines, Bladecenter, Networking – IBM BladeCenter T Type 8720 User Manual

Page 41: Guidelines

Advertising
background image

must

be

installed

in

the

BladeCenter

T

unit

in

I/O-module

bay

1

or

2,

or

both,

before

the

integrated

Ethernet

controllers

on

each

blade

server

system

board

can

be

used.

The

Ethernet

controllers

are

integrated

on

each

blade

server

system

board.

The

Ethernet

controllers

provide

1-Gbps

full-duplex

capability

only,

which

enables

simultaneous

transmission

and

reception

of

data

to

the

external

ports

on

the

Ethernet

switches.

You

do

not

need

to

set

any

jumpers

or

configure

the

controller

for

the

blade

server

operating

system.

However,

you

must

install

a

device

driver

on

the

blade

server

to

enable

the

blade

server

operating

system

to

address

the

Ethernet

controller.

For

blade

server

device

drivers

and

information

about

configuring

the

Ethernet

controllers,

see

the

Ethernet

software

CD

that

comes

with

your

blade

server.

BladeCenter

T

networking

guidelines

Your

networking

administrator

should

assist

in

the

configuration

of

the

network

infrastructure

before

you

connect

the

BladeCenter

T

unit

to

a

LAN

switch

or

similar

network

device.

This

section

provides

additional

guidelines

that

might

be

useful

in

setting

up

your

system.

A

BladeCenter

T

unit

with

two

Ethernet

switch

modules

and

one

management

module

has

the

internal

configuration

that

is

shown

in

the

following

illustration:

MAC

1a
1b
2a
2b
3a
3b
4a
4b
5a
5b
6a
6b
7a
7b
8a
8b

1

2

3

4

5

6

7

8

Switch A

Mgmt

Mod

Switch B

100 Mbps links

10/100 Mbps

1 Gbps or
100 Mbps links

1 Gbps links

1 Gbps links

Note: 2nd switch module is optional

Each

blade

server

has

two

independent

Ethernet

controllers,

each

with

its

own

MAC

address

and

a

dedicated

1

Gbps

link

to

one

of

the

switch

modules

in

I/O

module

bays

1

and

2

(controller

1

to

switch

A

and

controller

2

to

switch

B

in

the

illustration).

In

this

configuration

(the

default),

the

blade

servers

share

access

to

four

external

ports

on

each

switch.

There

is

no

internal

data

path

between

the

two

switches

within

the

BladeCenter

T

unit;

an

external

network

device

is

required

for

data

packets

to

flow

from

one

internal

switch

to

the

other.

The

management

module

has

a

separate

internal

100

Mbps

link

to

each

switch.

These

links

are

for

internal

management

and

control

only.

No

data

packets

are

allowed

to

flow

from

application

programs

on

the

blade

servers

to

the

management

module

over

this

path.

A

separate,

nonswitched

path

(not

shown)

is

used

for

communication

between

the

management

module

and

a

service

processor

on

each

blade

server.

Chapter

2.

Configuring

the

BladeCenter

T

unit

31

Advertising
This manual is related to the following products: