IBM BladeCenter T Type 8720 User Manual

Page 97

Advertising
background image

35.

Install

the

management

module(s)

at

the

front

of

the

unit

(see

“Installing

a

management

module”

on

page

53).

36.

Install

the

blade

servers

at

the

front

of

the

unit

(see

“Removing

and

installing

a

blade

server

or

filler

module”

on

page

64).

37.

For

Type

8720

(dc)

units,

connect

the

power

cables

to

the

dc

terminals.

For

Type

8730

(ac)

units,

plug

each

power

cord

into

the

input

power

connections

on

the

rear

of

the

BladeCenter

T

unit.

See

“Starting

the

BladeCenter

T

unit”

on

page

19).

38.

Install

the

power

modules

at

the

front

of

the

unit

(see

“Installing

a

power

module”

on

page

48).

39.

Install

the

blade

servers

(see

“Removing

and

installing

a

blade

server

or

filler

module”

on

page

64).

40.

Install

the

I/O

modules

(see

“Removing

and

installing

I/O

modules”

on

page

60).

41.

Start

up

the

system

(see

“Starting

the

BladeCenter

T

unit”

on

page

19).

Chapter

5.

Service

replaceable

units

87

Advertising
This manual is related to the following products: