Type 8730 (ac power), System reliability considerations, System – IBM BladeCenter T Type 8720 User Manual

Page 49: Reliability, Considerations

Advertising
background image

(see

the

documentation

that

comes

with

your

blade

server

for

information

about

turning

on

the

blade

server).

Make

sure

that

you

shut

down

the

blade-server

operating

system

before

turning

off

a

blade

server,

to

avoid

damaging

the

hard

disk

drives.

Notes:

1.

Within

two

minutes

after

power

has

been

connected

to

the

BladeCenter

T

unit,

the

management

module

applies

power

to

the

I/O

modules.

2.

If

a

power

failure

occurs,

the

BladeCenter

T

unit

restarts

automatically

when

power

is

restored.

3.

The

blade-server

power

button

turns

on

or

turns

off

the

blade

server

if

local

power

control

has

not

been

disabled

through

the

management

module.

4.

The

blade-server

power

button

turns

on

the

blade

server

only

if

the

green

power

light

on

the

blade

server

is

flashing

slowly.

If

the

light

flashes

rapidly,

the

blade

server

has

not

yet

synchronized

with

the

management

module

and

pressing

the

power

button

will

have

no

effect.

Type

8730

(ac

power)

The

BladeCenter

T

unit

can

support

two

or

four

power

modules.

The

BladeCenter

T

unit

does

not

have

a

power

switch.

To

start

the

BladeCenter

T

Type

8730

(ac

power)

unit,

connect

one

end

of

a

power

cord

into

input

power

connector

1

and

2

on

the

rear

of

the

BladeCenter

T

unit,

and

the

other

end

of

each

power

cord

into

a

220-volt

power

distribution

unit

(PDU)

that

is

connected

into

an

appropriate

electrical

outlet.

There

are

four

IEC320

power

connectors

on

the

rear

of

the

Type

8730

(ac

power)

unit,

marked

1-4

on

the

rear

panel.

Power

is

applied

to

the

respective

power

module

according

to

the

numbering

convention

on

the

rear

panel.

v

Power

connector

1

supplies

power

to

power

module

1

v

Power

connector

2

supplies

power

to

power

module

2

v

Power

connector

3

supplies

power

to

power

module

3

v

Power

connector

4

supplies

power

to

power

module

4

System

reliability

considerations

To

help

ensure

proper

cooling

and

system

reliability,

make

sure

that:

v

Each

of

the

module

bays

on

the

front

and

rear

of

the

BladeCenter

T

unit

has

either

a

module

or

filler

module

installed.

v

Each

of

the

blade

bays

on

the

front

of

the

BladeCenter

T

unit

has

either

a

blade

server

or

filler

blade

installed.

v

Each

of

the

drive

bays

in

a

blade

server

storage

expansion

option

has

either

a

hot-swap

drive

or

a

filler

panel

installed.

v

Each

of

the

PCI

slots

in

a

blade

server

PCI

I/O

expansion

option

has

either

a

PCI

adapter

or

a

PCI

filler

bracket

installed

v

A

removed

hot-swap

module

or

drive

is

replaced

within

1

minute

of

removal.

v

A

removed

hot-swap

blade

is

replaced

within

20

minutes

of

removal.

v

A

failed

blower

is

replaced

as

soon

as

possible,

to

restore

cooling

redundancy.

Chapter

4.

Setting

up

the

BladeCenter

T

hardware

39

Advertising
This manual is related to the following products: