Lennox Hearth ELITE EDVCRPM-B User Manual

Page 22

Advertising
background image

22

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

IMPORTANT: The vent termination is hot

while in operation and for a period of

time following the use of the fireplace.

To prevent contact with hot surfaces,

we recommend the use of a Termina-

tion Guard. See Page 39. This can be

purchased at your local dealer.

Figure 41

Figure 42

Installing the Square Horizontal Termination (SV4.5HT-2)

M. Install the desired termination -

1. Install the square termination (SV4.5HT-2)-

For the last step , from outside the exterior wall,

slide the collars of the termination onto the

adapter (the outer over the outer and the inner

inside the inner) until the termination seats

against the exterior wall surface to which it

will be attached. Orient the housing of the

termination with the arrow pointed upwards.

Secure the termination to the exterior wall. The

horizontal termination must not be recessed

into the exterior wall or siding by more than

the 1-1/4" (32 mm) as shown in Figure 42.

SVHRK Snorkel Cap –The snorkel cap is de-

signed to be fitted into a basement window box.

The SVHRK cap is for use with flex vent

The vertical distance between the inlet and outlet

of the cap is 28 in. (711 mm). pipe.

K. Attach termination adapter - Attach the

adapter (adapter - SV4.5RCH - provided with the

termination) to the vent section or telescoping

vent section), elbow or appliance collar as shown

in Figure 41 in the same manner as any SV4.5

vent component (refer to Step E).

J. Assemble vent run to exterior wall - If not

previously measured, locate the center of the

vent at the exterior wall. Prepare an opening as

described in Step B. Assemble the vent system

to point where the terminus of the last section

is within 7 in. (178 mm) to 11-1/4 in. (286

mm) inboard of the exterior surface to which

the SV4.5 HT termination is to be attached, see

Figure 42. If the terminus of the last section

is not within this distance, use the telescopic

vent section SV4.5LA, as the last vent section.

For wall thicknesses greater than that shown in

Figure 42, refer to Table 8 on page 23. This table

lists the additional venting components needed

(in addition to the termination and adapter) for

a particular range of wall thicknesses.

L. Install Firestop/Spacer at exterior wall

- When using the square termination, install

SV4.5HF (Secure Vent), SF4.5HF (Secure Flex)

Firestop/Spacer over the opening at the exterior

side of the framing, long side up, with the 3 inch

spacer clearance at the top as shown in Figure

41, and nail into place.

(The Firestop/Spacer may also be installed over

the opening at the interior side of the framing.)

Siding

Stucco

1-1/4" Maximum Recess of

the Square Termination into

Exterior Finishing Material

Exterior Surface of

Framing

6 in. to 9-1/4 in.

(152 to 235 mm)**

Exterior Surface of Siding

Interior Surface of

Finished Wall

Maximum wall thickness

10 in.(254 mm)**

SV4.5HT-2

Square Termination

Maximum Extent of

Vent Run Sections

Relative to Exterior

Surface of Framing

Last Vent Section. Use

T e l e s c o p i c V e n t

Section (SV4.5LA), If

Necessary

Adapter

SV4.5RCH

SV4.5HT-2

Square Termination

Venting Connection and Exterior Wall Recessing of the

Horizontal Square Termination (SV4.5HT-2).

*Use silicone caulking to seal

the top and sides of the

termination, up to the

underlayment, stucco, or

masonry wall surface.

**For thicknesses greater

than 10 inches, see Table 8.

*Caulk

*Caulk

Firestop/Spacer (SV4.5HF) shown

on the exterior side of the wall. It

may also be installed on the

interior side.

SV4.5HT-2

Termination

10-1/2"

(267mm)

7"

(178)

5-1/8"

(130 mm)

12-1/8"

(308 mm)

Note: Centerline of Vent Piping is

NOT the Same as the Centerline of

the Framed Opening.

6 to 48 inch Vent Section,

Telescopic vent section,

Elbow or Appliance Collar

See Figures 13 through 16 on

pages 11 for Min. Distance to

Base of Appliance.

Base of Appliance

3"

(76 mm)

1"

(25.4 mm)

Adapter

SV4.5RCH

Horizontal terminations have been designed to perform in a wide range of weather

conditions. Our terminations meet or exceed industry standards.

When selecting the locations of your horizontal terminations, do not place the termination

where water from eaves and adjoining rooflines may create a heavy flow of cascading water

onto the termination cap. If the cap must be placed where the possibility of cascading water

exists, it is the responsibility of the builder to direct the water away from the termination

cap by using gutters or other means.

Take care to carefully follow the installation instructions for the termination, including the

use of silicone caulking where required.

Advertising