Grain Systems PNEG-1797 User Manual

Page 11

Advertising
background image

1. Safety

PNEG-1797CE CE Approved T-Series Tower Dryer

11

Figure 1C

9. You may also need to lock out any associated equipment attached to the dryer.

10. Shut OFF, lock and tag the fuel supply at the main incoming valve.

(See Figure 1D,)

Figure 1D

11. Never work alone, it is recommended to work in teams of at least three (3) so help is immediately

available in the event of emergency.

12. On completion of the work, check all team members are out of the dryer and all work tools have

been recovered.

13. Close and lock all dryer accesses.

14. Do not re-connect power or fuel supplies until approved by the dryer owner or supervisor.

Advertising