Dryer installation, Chapter 4 dryer installation, Dryer layout foundation – Grain Systems PNEG-1797 User Manual

Page 26: Dryer layout, Foundation

Advertising
background image

26

PNEG-1797CE CE Approved T-Series Tower Dryer

4. Dryer Installation

Dryer Layout

System Layout

When considering dryer location make allowance for:

1. Grain handling systems.

2. Location of storage bins.

3. Wet grain supply.

4. Prevailing wind direction.

5. Fuel and power supply.

6. Noise.

7. Control panel location.

Site Location

Do not locate the dryer:

1. Inside a building.

2. Adjacent to combustible material which may be sucked in.

3. Within 2.0 m of other structures. Refer to specifications

on Pages 20-22

and dimensions

on Pages 23-25

.

You may need to obtain local permission for the dryer construction and should also consider:

1. Electrical code.

2. Fuel installation regulations.

3. Insurance requirements.

Foundation

Standard foundation details are given in

Figure 4A on Page 27

and

Figure 4B on Page 28

. For ground

conditions outside of these standards a local engineer will be required to carry out site specific
foundation design.