Grain Systems PNEG-1797 User Manual

Page 47

Advertising
background image

7. Dryer Start-Up

PNEG-1797CE CE Approved T-Series Tower Dryer

47

6. START switch

a. Check all selector switches are OFF.

b. Push the DRYER START switch.

c. Selector switches be activated.

7. Fuel check

a. Open the gas supply to the dryer.

b. Check correct supply pressure.

(See Table on Page 22.)

8. Load auger. With grain supply OFF.

a. Start and stop load auger to check correct operation and rotation.

b. Turn the load auger to AUTO and allow to run for 8 minutes.

c. Dryer should stop and display OUT OF GRAIN error message.

d. Press STOP to clear message.

9. Unload operation

a. Turn unload auger to AUTO. Check correct operation and rotation.

b. Turn unload auger to MANUAL position. Check correct operation and rotation.

10. Accutrol sweep metering system operation

a. With unload in AUTO, check metering speed increases and decreases as control is adjusted.

b. Turn unload OFF. Unload will continue for 60 seconds and shut down.

11. FAN switch

a. Turn FAN switch to ON the OFF and check correct operation and rotation.

12. Burner safety

a. Turn fuel OFF.

b. Start the fan.

c. Turn HEATER switch to ON.

d. Burner should attempt to light and then lockout.

e. Display should read “Ignition Failure Fan 1”.

Advertising