18' Manual Batch

Figure #15

REV. 1-25-96

CAULKING DETAIL

Before bolting the sidewall sheets together, check that you have the

proper gauge steel for the first ring. The higher gauge numbers denote

the thinner materials. (For example: 20 gauge material is thinner than

14 gauge.) In erecting Top Dry grain bins the thinnest material always

goes on top. The first sidewall ring you assemble will be the second

ring from the top of your bin. Check the various gauges of your bin

with the Color Code Chart and begin building accordingly.

Once you have selected the proper gauge material, begin assembling

the sidewall sheets according to the instructions on the following page.

- For bolting specifications on stiffeners, see Figure #11.

Note: The rope caulking is installed before each sheet is assembled.

Apply rope caulking between the last vertical row of bolts and edge of

outside sheet. There is sufficient caulking for all vertical seams on

storage and drying bins. Wipe sheet clean where caulking is to be

applied.

9.3/8" (23.813 cm)

Standard

Caulking

9.3/8" (23.813 cm)

Standard Sidewall Sheets

As Viewed From Outside

GAUGE

COLOR CODE

22

White

20

Red

19

Black/Yellow

18

Orange

17

Pink/Light Blue

16

Blue

15

Brown/Red

14

Green

13

Yellow/Blue

12

Black

11

Pink

10

Light Blue

9

Blue/Orange

8

Yellow