CENTER COLLAR ASSEMBLY

Add channel braces and brace plates to center collar as shown using 3/8" x 1" bolts and nuts. (Do not attach cross

channel until floor is done.)

Position the center collar at the center of the bin and raise it to approximately 7'-0.3/4" measuring from the

bottom edge of the collar to the concrete.

TD-100460

Channel Brace Plate

TD-100630

Center Collar

TD-100459

Channel Brace

TD-100004

Center Collar Cross

Channel