Figure #32, Leveling band location, Roof assembly – Grain Systems PNEG-365 User Manual

Page 28: Figure #31

Advertising
background image

Grain Systems, Inc. Assumption, Ill.

28

18' Manual Batch

Figure #32

REV. 9-30-96

TD-100660

7.2"

TD-100662

15.2"

TD-100661

10"

TD-100660

7.2"

TD-100661

10"

TD-100661

10"

6.3/8"

4.3/8"

2.3/16"

.3/16"

4.3/8"

6.13/16"

Inner Leveling Bands

Outer Leveling Bands

6 Band Sections per Ring

27 Holes Between Posts

3 Band Sections per Ring

13 Holes Between Posts

LEVELING BAND LOCATION

Position leveling bands as shown in the drawings below.

Use (2) 5/16" x 3/4" bin bolts to attach bands to posts. Also use 5/16" x 3/4" bin bolts to join band sections. Note

that band sections connect to each other only at endmost holes until completing the circle where an overlap

may occur.

ROOF ASSEMBLY

SPECIAL INSTRUCTIONS

It is now time to assemble the roof. When starting, align manway and ladder such that it coordinates with the other

accessories and does not interfere. The roof is assembled according to the instructions in the roof hardware box,

WITH THE FOLLOWING EXCEPTIONS:

1. Locate eave clips so that a roof sheet will be centered over sidewall ladder.

2. Four eave clip shims per eave clip must be installed.

3. Use TD-100274 Roof Brackets shipped in the Top Dry hardware rather than the brackets shipped in the roof

hardware.

Top Ring Sidewall Sheet

R-007-2

Small Eave Clip

TD-100045 (4)

Eave Clip Shim

TD-100274

Roof Bracket

Eave Clip Assembly

Figure #31

Advertising