Grain Systems PNEG-365 User Manual

Page 31

Advertising
background image

31

Grain Systems, Inc. Assumption, Ill.

18' Manual Batch

Field cut notch

Round corners to

prevent tearing

WINCH ASSEMBLY

Figure #35

Roof Ladder

Support Channel

Top Leveling Band

Note: Field cut rounded notches

in the outer leveling band(s)

where the two roof support

channels hang from the roof ribs.

Complete erection of bin. Install winch as shown using 5/16" x 3/4" bin bolts to attach to the sidewall. The cable clamps

from either side of the pulley on the cross channel should be removed and the dump chutes pulled tightly shut. Check

for the uniformity of the chains on the dump chutes and readjust if needed. The downward travel of the chutes must

be limited to prevent damage on new Top Dry bins. This can be done after the bin is complete and the cable stop bracket

and clamp is set to indicate when the dump chutes are fully closed. Open the chutes until the cable clamp is about 30"

above the cable stop bracket. Attach another cable clamp just below the small outside pulley bracket making sure it

is tight.

30"

Sidewall

Cable clamp to

limit downward

travel of chutes

S-4691

Winch

TD-100041

Winch Mount Bracket

Cable clamp

Outside pulley

brackets

Cable stop

TD-100040

Winch Stop Bracket

Figure #36

REV. 9-30-96

Advertising