Grain Systems PNEG-365 User Manual

Page 19

Advertising
background image

19

Grain Systems, Inc. Assumption, Ill.

18' Manual Batch

STIFFENER AND BRACKET INSTALLATION

Install the stiffeners on the outside of the bin (as shown in Figure #14) and the wall brackets on the inside of the bin.

The wall brackets are to be positioned with the bracket's top hole matching the first hole up from the horizontal seam

(not counting the horizontal seam). Bracket to sidewall connection using a 3/8" x 1.1/2" bolt (S-2086), head outside,

with a neoprene washer (S-3558) against the wall on the inside, and a corrugation spacer (S-7041).

NOTE: It may be necessary to ream out sidewall holes with a drill and 3/8" bit for easier installation.

S-7041

Corrugation

Spacer

TD-100667

Wall Bracket

S-3558

Neoprene

Washer

SECOND RING

TOP RING

Figure #18

Figure #19

S-3558

Neoprene

Washer

S-7041

Corrugation

Spacer

TD-100667

Wall Bracket

REV. 9-30-96

Advertising